Knowledge Bank

Archive

Please reload

July 14, 2017



The Department of Building code requires the drafting of drawings containing detailed plans and specification for the repair of defective façade. These defects can be prioritized into three categories HAZARDOUS, PRECAUTIONARY and COSMETIC.

Items listed as being hazard...

July 14, 2017

SEG can provide you or your company with detailed plans and specifications required to be filed with the Building Department to receive approval and building work permits, as well as RFP bid packages for potential contractors to bid on.

Whether cosmetic or efficient des...

July 14, 2017

To protect the city water supply from contamination the DEP-Department of Environmental Protection, has regulated the requirement that all buildings containing hazardous material must install a back flow preventor device, commonly known as RPZ, (Reduce Pressure Zone)....

July 14, 2017

Prior to buying an apartment, a house or a building Due Diligence inspection is required. With the support of a technical professional and a detailed inspection report an investor is better able to make an informed decision as to the worth of a property.

Salamon Enginee...

July 14, 2017

As one of the more costly improvement projects, window replacement calls for careful consideration of several key issues including budget, structural stability of the frame, water resistance, air infiltration, and noise abatement.

For architecturally significant buildin...

July 14, 2017

Over a period of time rain, wind and erosion will destroy any roof waterproofing. Periodic inspection and maintenance is required to maintain the roof and prevent severe damages to the building. But when further repairs are not warranted, and a new roof replacement is...